Project Name
Detention Pond, Excavation, Mass Grading, Water, Sewer & Drainage (WSD) and Paving Facilities to Serve Imperial Forest, Brazoria County, Texas
Location
Houston, TX
Description of Scope of Works
The primary objectives of this study were to provide construction material testing services for the above-referenced project.
Client Name
KB Home
Location
11314 Richmond Ave, Houston, TX;
Tel: 281-668-3872
Tel: 281-668-3872
The general scope of work for quality control for this project consisted following:
- Proof-rolling observations,
- Laboratory determination of clay liner suitability,
- Laboratory and field density testing of the excavated detention pond material,
- Cement Stabilized Sand Proctor testing, compressive strength testing, and backfill density tests,
- Moisture-density & Atterberg limits of lime or lime-fly ash stabilized soils, and soil backfill materials for Water, Sanitary, and Drainage Facilities,
- Field compaction observation and testing of compacted fill materials, and trench backfill materials,
- Rebar Inspection,
- Concrete Mix Design Review,
- Concrete placement observation and testing on utilities and Pilot Channel,
- Concrete compressive strength testing of concrete,
- Result Reporting,
- Providing certifications letter of compliance.